Project title |
Updating the Detail Design for Al-Qaida Wastewater Network and Treatment Plant |
Year start |
May, 2019 |
Year end |
July, 2019 |
Client |
Urban Water Supply and Sanitation Projects, Ministry of Water and Environment |
Consultant |
The Professional – E for Engineering and Development - Yemen |
Consultant Duties |
• Site investigation and survey works including social and environmental impact assessment • Creating hydraulic models using Water-Cad & Sewer-Cad software. •Developing of hybrid solar system for operating the WWTP •Preparation of the Detailed Drawings/specification and Tender Documents for the project. |
Project features |
Narrative Description of Project: The project aims at providing the city of Al-Qaidah with a sanitation system contains of the following: •Approximate 53,000 meters of wastewater gravity uPVC pipe lines, DN 200 to DN 500; •Approximate 35,000 meters of waste water house connections of uPVC pipes, DN 150, including 5,072 inspection chambers; •Approximate 2047 manholes; •One sewage treatment plant of 13000 m3/day capacity, including inlet facility (screen unit, venture flume unit), Imhoff type primary clarifier, detention tank, trickling filter, secondary clarifier, sludge drying beds, excess sludge pumping system, effluent re- circulation pumping system, operation building, emergency power generator set, boundary walls, gate house, mixing and distribution chambers, effluent discharge pipe line DN 300, plant and street lighting system. |
P.O Box: 1020, Sana'a, Yemen
Tel: +967 1 298 038
Fax: +967 1 298 038
Email: info@deep-ye.com