Our Projects

Maintenance of Sana’a – Al-Hodeidah Road (Suq Alaman – Mousanah)

Maintenance of Sana’a – Al-Hodeidah Road (Suq Alaman – Mousanah)

 

Project title

Damage Assessment and Proposed Immediate Intervention for Maintenance of Sanaa Al-Hodeidah Road (Suq Alaman Mousanah) (42.3 km) Yemen.

Year start

2018

Year end

2018

Client

Road Maintenance Fund, Ministry of Public Works and Highways (MPWH).

Consultant

The Professional – E for Engineering and Development - Yemen

Consultant Duties

-          Damage survey and assessment.

-          Identifying repair/ reconstruction requirements.

-          Carrying out detailed design.

-          Preparing bidding documents, include:

-          conditions of contract, specifications, detailed drawings, bill of quantities and cost estimate.

Project features

The project covers rehabilitation and improvement works for about 42.3Km length of Sana’a – Al-Hodeidah Road (from Suq Alaman to Mousanah) including:

·         Improve pavement conditions, strength, ride ability, and extend residual life.

·         Improve road safety elements (traffic signs, pavement markings, guard rails).

·         Reduce operation cost, traffic conditions and journey time.

·         Improve safety to road users.

 

Date

15 November 2020

Categories

Infrastructure

Get in Touch

P.O Box: 1020, Sana'a, Yemen

Tel: +967 1 298 038

Fax: +967 1 298 038

Email: info@deep-ye.com